2nd day starts " it will be a long day "
Techs made some disassembly while i was in work.
and some bad news was waiting me.
1. A/C rad is damaged
2. Coolant rad is also damaged
3. Lots of rust every where & the Alternator is burned & stucked
My car external was like that:-
and Internal like that:-
Lots of parts was out
But disassembly never ends. we need to take all of the donor parts out.
We stuked when we tried to change the pedals assembly.
![sick sick](/forum/images/graemlins/default/sick.gif)
:@ it didt want to move by any force we applied
![frown frown](/forum/images/graemlins/default/frown.gif)
.
After some mins thinking a brilian idea got on the way.
We need to heat and burn the adhesive silicone :), and it worked.
That not a lamp. its the torch light
![smile smile](/forum/images/graemlins/default/smile.gif)
After solving this, we start assemble things inside the cabin.
Also some engine bay wiring and other stuff.
We were having fun too
At the end of the day 4:00 am, we were exhausted , but we were able to park the engine - its really heavy, inside the store.
and put the remaining from the donor half a side.
At this moment, day 2 finished and next day it was my long trip to gather all damaged and missed parts...