2nd day starts " it will be a long day "
Techs made some disassembly while i was in work.
and some bad news was waiting me.
1. A/C rad is damaged
2. Coolant rad is also damaged
3. Lots of rust every where & the Alternator is burned & stucked
My car external was like that:-
and Internal like that:-
Lots of parts was out
But disassembly never ends. we need to take all of the donor parts out.
We stuked when we tried to change the pedals assembly.
:@ it didt want to move by any force we applied
.
After some mins thinking a brilian idea got on the way.
We need to heat and burn the adhesive silicone :), and it worked.
That not a lamp. its the torch light
After solving this, we start assemble things inside the cabin.
Also some engine bay wiring and other stuff.
We were having fun too
At the end of the day 4:00 am, we were exhausted , but we were able to park the engine - its really heavy, inside the store.
and put the remaining from the donor half a side.
At this moment, day 2 finished and next day it was my long trip to gather all damaged and missed parts...